Description
In this course, you will learn:
- Estimate the entire project using AutoCAD and Excel.
- Estimate the entire project using PDF files or hard copies.
- Beginner Training for Plan Swift.
- Estimation of the entire project using Plan Swift software.
- Bar Bending Excel schedule for foundations, columns, beams, slabs, and stairs.
- How to Find Materials Like Cement, Sand, Coarse Aggregates, and Bricks.
- Complete the Material Statement in Excel.
- In Excel, rate analysis is performed for various works such as excavation, P.C.C., R.C.C., masonry, tiles, plaster, and painting.
- Will learn how to create a B.O.Q for a project.
- Mode of Payment to Contractor.
- Interim Payment in Excel.
- Variation Order in Construction.
- How to Create a Variation Order in Excel (Important for Quantity Surveyors).
- Microsoft Excel for Beginners.
- Primavera P6 Training For Beginners
- Auto-cad 2021 For Beginners
- How to Create Complete Project In Autocad Inculding Steel Detailing
- MS Project Training For Beginners
- Activities And W.B.S List In MS Excel
- Adding Manpower In Excel (Labor, Mason, Carpenter etc.)
- Finding The Duration Of Activities Based On Productivity
- Complete Project In Primavera p6 (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More
- Complete Project In MS PROJECT (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More
- Practice Question After Ending Of Each Module
Syllabus:
- Foundation Work (Isolated Footing) Estimation With AutoCad
- Column Necks (Estimation With AutoCad)
- Backfilling (Estimation With Cad)
- Grade Beam (Estimation With AutoCad)
- Slab On Grade (Estimation With AutoCad)
- Column In Superstructure (Estimation With AutoCad)
- Formwork And Concrete For Lintels (Estimation With Cad)
- Stairs (Estimation With AutoCad)
- Top Beam (Estimation Through Cad)
- Slab (Estimation With AutoCad)
- Brick Work In Superstructure (Estimation With AutoCad)
- Brick Works In Parapet Wall And Mumty (Estimation With AutoCad)
- Plaster Work (Estimation With AutoCad)
- Tiles And Marble (Estimation With AutoCad)
- Paint Work (Estimation With AutoCad)
- Bar bending Schedule Basic
- Bar Bending Schedule Excel Sheet (Meter And Millimeters)
- Bar Bending Schedule For Footing
- Bar Bending Schedule For Columns
- Bar Bending Schedule For Grade Beams
- Bar Bending Schedule For Top Beams
- Bar Bending Schedule For Stairs.
- Bar Bending Schedule For Slab
- Foundation Work (Estimation Through PDF File/Hard Copy)
- Backfilling And Column Necks (PDF/Hard Copy)
- Grade Beam (Estimation Through PDF File/Hard Copy)
- Slab On Grade (Estimation Through PDF File/Hard Copy)
- Column In Superstructure (Estimation Through PDF File/Hard Copy)
- Stair Formwork And Concrete (Estimation Through PDF File/Hard Copy)
- Formwork And Concrete For Slab (Estimation Through PDF File/Hard Copy)
- Brickwork In Superstructure (Estimation Through PDF File/Hard Copy)
- Plaster Work (Estimation Through PDF File/Hard Copy)
- Tiles And Marble (Estimation Through PDF File/Hard Copy)
- PLANSWIFT BEGINNERS TRAINING (If You Know Basic Tools Of Plan Swift you can skip
- Foundation Works (Estimation Through Plan swift) PDF OR SCAN FILE
- Column Necks (Calculations Through Plan Swift No 1 Take off Software)
- Grade Beam (Calculations Through Plan Swift No 1 Take off Software)
- Slab On Grade (Calculations Through Plan Swift No 1 Take off Software)
- Column In Super Structure(Calculations Through Plan Swift No 1 Take off Software
- Stairs (Calculations Through Plan Swift No 1 Take off Software)
- Slab (Calculations Through Plan Swift No 1 Take off Software)
- Brick Work (Calculations Through Plan Swift No 1 Take off Software)
- Plaster Works (Calculations Through Plan Swift No 1 Take off Software)
- Tiles And Marble Works(Calculations Through Plan Swift No 1 Take off Software)
- Rate Analysis Manual Calculations
- Material Statement Excel Sheet (Imp For Project Planning In Material Resources)
- Bill Of Quantity (B.O.Q)
- Primavera p6 Training (Important if you are beginner in primavera and planning)
- Project Planning (Activity WBS List In Excel In Detail)
- Defining Resources And Their Productivity In Excel Sheet
- Budgeted Unit And Duration To Activities.
- Creating Complete Project In Primavera p6
- Relationships
- How to Create And Assign Resources In Primavera For Our Project
- How to Update The Project According To Actual.
- Ms Project Training For Beginners (Very Important If You Are Begin In MS PROJECT
- Important Setting And Importing Activities In Ms. Project.
- Defining W.B.S For Our Project In MS Project.
- Relationships To Activities
- Creating And Assigning Resources In MS PROJECT
- How to Update The Project In MS Project.
- Mode Of Payments To Contractor
- Variations Orders In Constructions (Very Important For Quantity Surveyors.
- Excel Training For Beginners
- Formulas In Excel
- Auto-cad Training For Beginners
- Complete Project In Autocad {Creating Basic Plan In Autocad}
- Complete Project In Autocad { Creating Column Layout Plan }
- Step By Step Process To Create Detail Plan In Autocad.
- Column Section In Autocad (Adding Steel Detail In Colomn Logn and x-section)
- Grade Beam Plan And Section { Creating Steel Detail In Grade Beam Section }
- Stair Plan And Section In Autocad
- Doors And Windows Schedule In Autocad.